1300 720 958

With battery rebates bringing a wave of new solar and battery installs, homeowners are being approached by more companies than ever. Most are doing the right thing. But a recent case is a good reminder to check who’s actually doing the work on your property.

In late October 2026, Australia’s Clean Energy Regulator (CER) reported that it had fined a Victorian installer $10,000 for false statements. He had declared he attended installations in Melbourne while he was actually interstate, and his accreditation was suspended. Two other installers were also excluded from the scheme.

The regulator said it was satisfied there was no systemic fraud, so this isn’t a reason to panic. It is a good reason to know what to look for, especially on acreage properties like those in Kenthurst, where installs are often bigger and more involved.

What happened, and why the regulator cares

When you install solar or a battery, your system usually creates small-scale technology certificates (STCs). That’s what reduces the upfront price. To claim them, the accredited installer must sign a declaration confirming the work was done properly and that they were on site at the required times.

In this case, the installer signed those declarations for jobs he never attended. That matters because the onsite visits exist to make sure your system is set up safely and to the required standards.

Accreditation belongs to the person, not the company

This is the part many homeowners don’t realise. Solar accreditation is held by individual installers, not companies. A company’s website might say “accredited”, but what matters is whether the person designing and installing your system holds accreditation.

Before you sign, ask:

  • Who will be the accredited installer on my job? Get their name.
  • Are they employed by your company, or a subcontractor?
  • Who is the licensed electrician doing the electrical work? In NSW you can check an electrical licence through Service NSW.

You can also check an installer’s accreditation with Solar Accreditation Australia (SAA).

The three times your installer must be on site

The accredited installer must be on site at three key points:

  1. Job setup, at the start of the installation
  2. A mid-installation check, while the work is under way
  3. Testing and commissioning, when the system is switched on and checked

It’s reasonable to ask your installer to confirm when they’ll be there. On a bigger job, it’s also worth being home, or having someone home, for commissioning, so the installer can walk you through how the system works.

Why it matters even more on acreage

Kenthurst properties often have setups you don’t see on a suburban block:

  • Larger systems, because of bigger homes, pools, workshops or extra buildings
  • Arrays on sheds or ground mounts, instead of only on the house roof, like the Kenthurst shed install pictured at the top of this post
  • Long cable runs between the panels, the battery, the house and the switchboard
  • Outbuildings with their own supply, which can complicate the design

Each of these adds steps where good design and careful installation really count. Cable size, voltage drop, isolators and how the system connects to your switchboard all need to be done properly. That’s exactly why the onsite checks matter.

Paperwork you should get after the install

When the job’s finished, you should receive:

  • A Certificate of Compliance for Electrical Work (CCEW). This is the NSW electrical safety certificate for the work done.
  • Warranty documents for the panels, inverter and battery
  • System documentation, including the system design, a list of components and the user manuals
  • Confirmation of the network connection approval from your electricity network
  • Your STC paperwork, if the certificates were assigned to the installer

If any of these are missing, ask for them. A reputable installer will be happy to provide them.

What the new “national rulebook” could change

At the All Energy Australia conference in late October, the Clean Energy Council said energy ministers have agreed to one national rulebook. It includes a single national code covering inverters, batteries and EV chargers, plus a new consumer energy regulator within the CER.

The legislation is still being drafted, so it’s too early to say exactly how it will affect homeowners. The aim is more consistent rules and stronger oversight across Australia.

FAQs

Is my installation still valid if my installer wasn’t on site?

That’s a question for the Clean Energy Regulator. If you’re worried about your system, a licensed electrician can inspect it and check it’s safe.

Can I ask for my installer’s accreditation number?

Yes. It’s a reasonable request, and a reputable installer won’t mind.

Do you install in Kenthurst?

Yes. Our in-house teams install solar, batteries and EV chargers across the Hills District, including Kenthurst and the surrounding acreage areas.

Want an install you can trust?

Innovate Electrical and Solar has completed more than 9,500 solar and battery installs. Our electrical and solar/battery accredited teams are in-house, so you’ll know exactly who’s working on your property.